This popup form can be accessed via the
import icon at the bottom of the Lessons tab at any of the selected parent asset view pages (e.g.
organisation,
programme,
project,
sub-project,
risk or
issue), as shown in Figure 1.
import consists of a number of phases:

Figure 1 – Access via lessons tab
The import popup is shown in conjunction with each phase below, and can be used to import a number of lessons from a Comma Separated Values (CSV) file into the selected parent asset. Completing the lessonsPhase 1 – Import file
Figure 2 – Import lessons form (1)
Phase 2 – Mapping
Figure 3 – Import lessons form (2)
Phase 3 – Default values
Phase 3 allows you to set default values for any fields you chose not to import from the file. The fields may be the same as for creating a new lesson, but the fields present in this phase are very much dependent on which options you selected in phase 2. Click the Import lessons button to start importing the lessons.Phase 4 – Importing…
Figure 4 – Import lessons form (4)